Solar Development Land Origination
Criteria-driven sourcing for utility-scale and community solar — screened for acreage, land use, constraints, and interconnection position before outreach.
Utility-scale and community solar sourcing
The two solar segments demand different sites. Utility-scale projects need large, contiguous, open acreage with a transmission or larger distribution interconnection path; community solar needs smaller, well-sited parcels closer to load with distribution access.
We source for the segment you are developing, with screening criteria matched to its actual site requirements rather than a generic solar template.
Acreage screening
Your capacity targets translate into acreage thresholds, adjusted for layout assumptions, setbacks, and the buildable share of a parcel after slopes, tree cover, wetlands, and floodplain are considered.
We screen for parcels that meet the threshold after constraints — not on raw acreage, which overstates what many parcels can host.
Land use and zoning considerations
Solar is treated differently across jurisdictions: districts permitting it by right, conditional use paths, agricultural district rules, and local standards for screening, setbacks, and decommissioning.
We run a preliminary zoning review on candidate parcels using public records to filter obvious land-use barriers before outreach — a desk screen, not legal advice or a permit determination.
Preliminary environmental constraints
Wetlands, floodplain, protected species habitat, conservation easements, and preserved farmland programs all affect what a parcel can host. We note visible and mappable constraints as part of the screen.
Formal environmental assessments are performed later in diligence by qualified professionals; our role is to flag obvious issues early so your team does not spend time on compromised sites.
Grid infrastructure proximity
Interconnection position is a decisive screen for solar economics. Candidate parcels are evaluated against mapped three-phase distribution, substation locations, and transmission corridors relative to your project scale.
As with all early screening, proximity indicates a plausible path — it does not establish available capacity. Interconnection feasibility is determined through utility studies.
Landowner engagement
We research ownership, conduct professional outreach, and qualify landowner interest and expectations before a site is presented. Owners are told clearly what a project involves and what the process does and does not promise.
For agricultural parcels, we surface the questions that matter early — continued agricultural use, preserved farmland restrictions, and family or tenant considerations.
Developer-specific acquisition parameters
Every developer’s buy box is different: target markets, project segment, capacity range, acreage thresholds, interconnection profile, and deal structure preferences. Your criteria are the input; the pipeline is the output.
Submit your criteria once, and we will come back with aligned site opportunities rather than generic listings.
Related resources
Submit Solar Acquisition Criteria.
Tell us your target markets, project segment, capacity range, and site requirements — and receive aligned site opportunities.